商铺名称:厦门纪扬科技有限公司
联系人:李经理(先生)
联系手机:
固定电话:
企业邮箱:624232572@qq.com
联系地址:福建省厦门市翔安区鼓岩路1号华论国际1003室
邮编:361000
联系我时,请说是在快能纺机网上看到的,谢谢!
主营:世界知名品牌的PLC 、DCS 系统备件 模块
①Allen-Bradley(美国AB)系列产品》
②Schneider(施耐德电气)系列产品》
③General electric(通用电气)系列产品》
④Westinghouse(美国西屋)系列产品》
⑤SIEMENS(西门子系列产品)》
⑥销售ABB Robots. FANUC Robots、YASKAWA Robots、KUKA Robots、Mitsubishi Robots、OTC Robots、Panasonic Robots、MOTOMAN Robots。
⑦estinghouse(西屋): OVATION系统、WDPF系统、MAX1000系统备件。
⑧Invensys Foxboro(福克斯波罗):I/A Series系统,FBM(现场输入/输出模块)顺序控制、梯形 逻辑控制、事故追忆处理、数模转换、输入/输出信号处理、数据通信及处理等。Invensys Triconex: 冗余容错控制系统、基于三重模件冗余(TMR)结构的zui现代化的容错控制器。
⑨Siemens(西门子):Siemens MOORE, Siemens Simatic C1,Siemens数控系统等。
⑩Bosch Rexroth(博世力士乐):Indramat,I/O模块,PLC控制器,驱动模块等。
◆Motorola(摩托罗拉):MVME 162、MVME 167、MVME1772、MVME177等系列。
MCS SA-2000-E ID177014
align the insert during installation.
F 1 2B-52085
547
Tester, Compressor Bearing Support
Repair
Class 6 Rebuild Used on all turbos - I
required.
Used with the hydrostatic tester 1A-91752 (9548080)
to water test the compressor bearing support after
repair or a severe failure of the turbocharger. The
two round pieces seal the compressor journal
bearing area, and the rectangular piece blanks the
plug hole.
F 1 2B-52086
548
Handler, Compressor Bearing Support
Insert
Class 6 Rebuild - Used on 16E & EB and 20E
& EB turbos - 1 required.
Used with the compressor bearing support
machining fixture 2B-52083 (9548079) and guide
pins 2B-52085 to install a chilled insert into the
support. The device locates on the oil drain hole.
F 1 2B-52104
Part number description Item QTY
TOTAL picture F/L
549
Drill Fixture, Idler Gear Support
Conversion To High Capacity
Class 6 Rebuild - Used to convert 16E & EB
and 20E & EB turbos to high capacity - I
required.
Used as a guide for machining the idler gear support
for conversion to a high capacity gear train
turbo. This fixture locates in the idler stubshaft pilot
and in the bolt hole directly below the drain hole in
the support. Perform the following steps.
1. Drill a second oil spitter hole 1.19mm (3/64")
diameter, 15.88 mm (5/8") deep.
2. With the larger 22.225 mm (.8750") D.D.
bushing removed so it does not obstruct the
drilling guide for the additional bolt hole, drill
the bolt hole 10.716 mm (27/64") diameter,
through the idler gear support 30.15 mm
(1.187").
3. Install the 18.256 mm (23/32") 1.0. bushing
and lock with the locking bolt. Drill a
18.256mm (23/32") diameter hole through the
support.
4. Replace the 18.256 mm (23/32") J.D. bushing
with the 19.055 mm (.7502") J.D. bushing.
Ream the hole. 19.063 mm + 0.000 - 0.025
(.7505" + .0000" - .0010',) through the support.
5. Remove the fixture and tap the new bolt hole
for a 1/2" UNC-3B thread through the
support
F
1 2B-53894